capstan
Home> Products >capstan

capstan--- double wheel

Item No.: DC260-800
double wheel capstan used for round or flat cable high speed hualing off
INQUIRY
Description package&transporation test running & installation and commission
double wheel capstan
usage: 
double wheel capstan used for round or flat cable high speed hauling off.


machine features:
1. stable capstan: pure aluminum wheel without treatment to enlarge the friction, avoid sliding even with small wires, ensure the cable qualtity.
2. easy to operate: with deep grooves, reduce the possiblility of jump out when machine stop, no need thread the wire again.
3. no limit speed adjust: with no limit speed adjust mode, motor directly connect with gear box, reduce the working noise, can adjust speed without stop the machine.
4. with wire fulling barrel, can directly with barrel for take up.
5.double motorized capstan: both the two capstan wheel use motorized, with belt mechanical driving. so the wire will not influnced by the capstan wheel weight, speed and other, the wire will not be harmed in the capstan process. 


technical parameter:
model: 260, 340, 400, 500, 600, 800
structure: motorized double wheel capstan
capstan wheel: material aluminium magnesium alloy or pure aluminum wheels, with harden treatment, wear-resistant.
Wire dia.: 0.2-20.0mm
wheel grooves: flat bottom 8 grooves.
Line speed: Max.600m/min
capstan cover: SUS304 stainless steel, sealing type cover.
water proof device: with water guiding board, avoid water fly out from the macine.
withdraw pipe: 1 1/2"
speed adjust: no limit speed adjust.
driven power: 1.3KW/1.8HP - 7.5KW/10HP motor with inverter








 
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:

test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X