pay off
Home> Products >pay off

pay off --- automatic lift

Item No.: TD400-630
pay off used for small size copper wire, aluminum wire, copper wire, core wire, cable and other wires pay off, the pay off can used together with extruder line, bunching machine, single twister and other machines. the pay off is driven pay off, automatica
INQUIRY
Description package&transporation test running & installation and commission
pay off --- automatic lift
usage: 
pay off used for small size copper wire, aluminum wire, copper wire, core wire, cable and other wires pay off, the pay off can used together with extruder line, bunching machine, single twister and other machines. the pay off is driven pay off, automatically lift.


machine features:
1. structure: pay off use integrate structure, put the pay off and tension dancer into one structure, save the space and effort to load the reels.
2. quick load and unload the reels: pay off use double side tighten, with horizontal slide, easy to tighten the reels.
3. safety guard: pay off with motor overload protection/phase lack protection, lift limit, ensure the longer service life.


technical parameter:
pay off models: 400, 500, 630
pay off machine structure: tip cone tighten, auto lift, shaftless driven pay off
pay off suitable reel size: Ø250-Ø630
pay off products range: Ф0.5~6.0mm
pay off line speed: Max. 150m/min
pay off reel lift: automatically
pay off reel tighten:  tip cone manually tighten
pay off tension control: counter weight type tension control, potentiometer given voltage signal to control the motor speed.
pay off wire break: wire break inspect, auto alarm and stop the machine when wire break.
pay off bearing weight: 300-500kg
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:


test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X