pay off
Home> Products >pay off

pay off --- non motor drive

Item No.: HP500-630
the pay off used for copper wire, enemal wire, tinned wire, cable core wire and other wires pay off, integrate design, manually lift, tip cone quick tighten cable reel. high speed with lower price.
INQUIRY
Description package&transporation test running & installation and commission
pay off --- non motor drive
usage: 
the pay off used for copper wire, enemal wire, tinned wire, cable core wire and other wires pay off, integrate design, manually lift, tip cone quick tighten cable reel. high speed with lower price.


machine features:
cost effective: the pay off is the most popular pay off in cable industry, simple structure, easy to operate, lower cost, occupied small space.


technical parameter:
pay off model: Ø500, Ø630
pay off structure: friction tension passive pay off
pay off reel dia.: Φ300, Φ400, Ø500, Ø630
pay off wire dia.:Φ0.5-4.5mm
pay off line speed: Max.400m/min
pay off reel lift: level type manually lift
pay off reel tighten: tip cone tighten
pay off brake: belt brake
pay off tension control: spring counter weight pay off tension.
pay off tension adjust: adjust pay off tension through adjust the tighteness of spring, rod rotate drive the brake belt control pay off tension.
pay off wire break: wire break machine auto alarm and stop
pay off tension range: 300-1000g
pay off bearing weight:Max.300kg
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:


test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X